Oct 13, 2013

Escape Velocity for BW-on-HANA Projects


AUTHOR'S NOTE: Escape velocity (Ve) is the speed at which the kinetic energy + the gravitational force on an object is zero. Any speed above that will allow the object to break free from the gravitational pull of the larger mass. Ve is a combination of  G= gravitational pull; M=mass of the larger object; and r = distance from the center of gravity. Ve is used to launch rockets free from the gravitational constraints of planets, and it can also be used to leverage the gravitational mass as a slingshot -  where the gravitational pull of large bodies can actually be used as a slingshot for acceleration and escape. This is written as  

In our context the global desire is to escape from the dark pull of failure. Let’s call this the black-hole of failure.

Ve= Escape Velocity in BI projects (including SAP HANA BI) can thus be defined as

Where

F is the pull towards failure as a constant (where the rate of failure is constantly balanced by the rate of success thus a point of accepted tolerance by business stakeholders and users). F can be more clearly understood where if a team delivers 5 successful reports (defined as reports that meet business expectations) and at the same time deliver 5 reports that do not meet business expectations- but are not punished by the system, governance or the business owners as a failure team the 0.5 is the balancing constant. Now if the team produces 4 successful and 6 not successful deliverables which begins a gravitational pull that is negative, or a pull that can crash either the developer of the team towards the black-hole of failure then a corrective action has to be taken at all points below 0.5. In our example if the team delivers 10 out of 10 reports that do not meet business expectations it assumes the developer or team reaches a 0 velocity and falls straight into the black-hole of failure never to emerge again. This is a perpendicular fall to oblivion.
P represents the propensity towards failure. This represents the negative mass of your black-hole, i.e. the pull of failure. P represents the place you don’t want to go. P also represents the failure probability with specific standards, processes and methodologies. P is often predictable when viewed through a scientific lens. For example if you have standards and processes that constantly deliver a 50% failure rate,  then your P factor has to be large whichever way you look at it.

n represents the center of negative gravity of the  dark planet and the lowest point of no return. At this point the trajectory of the developer and/or team has no recourse to getting additional budgets, additional chances or any recourse for another try. At this point managers are fired, partners are fired and individuals are fired. Of course in our example it is not the end of existence as the teams are simply replaced by another partner, manager and team – mostly in desperation, at far lower budgets, in very unplanned projects and with a lot of (n) negative pressure. 

I tend to be hyper-attracted to two Gartner findings on global BI.

Gartner in 2003 – “50% of BI projects will not meet business expectations”
Translation: There is a very high probability that 50% of reports in your production environment are either not being used or will never be used by your business users.

Your takeaway: As you rush ahead at full speed understand that what got you here (i.e. a design that constantly delivers a 50% failure rate) should not be used to take you to the strategic HANA future

Your decision:
1.    Continue with the current standards and processes
2.    Continue with your current architects and modelers
3.    Continue with your current System Integrators

.. and reach the same point of failure where you currently exist only after deploying a net new acceleration technology

Gartner in 2013 – “70% of BI projects will not meet business expectations”
Translation: In the 2012-14 period more and more customer are treating new technologies as Technical installations. While global spend on BI has gone up their propensity to failure has also increased. The current rate of failure is over 70%, from a 50% in the 2003-09 periods.

Your takeaway:
[1] HANA is a business solution and not a technology installation, what is the benefit of accelerating a 70 second query to 1 second if business will never use it
[2] There are many scientific ways to reduce the cost of your HANA migration anywhere from 20 to 60%

Gartner’s 2013 advice for big data projects “This is a time of accelerating change,  where your current IT architecture will be rendered obsolete,” Mr. Sondergaard, Gartner Sr. Analyst, said.  “You must lead through this change, selectively destroy low impact systems, and aggressively change your IT cost structure.  This is the New World of the (big-data), the next age of computing.”

Your decision:
1.    Find out how to leverage the scientific options of the IQDCT HANA methodology. Increase Quality, Decrease Cost and Time
2.    Build net-new global HANA standards and processes and then seriously consider moving greenfield to BoH (BW-on-HANA)
3.    Build net-new global HANA FEDW (Gartner architecture) and leverage automated HANA modeling
4.    Consider changing your current System architects, design planners and even your SI, i.e. there is adequate data that proves that existing folks will only follow existing / familiar paths. If you leverage existing resources then they will take you only on a predictable path, i.e. 70% failure. If this were not true then they should have taken you on a path of Escape Velocity way before you read this paper.
5.    Consider merging your many BW system on a global FEDW architecture. Benefit 100% central governance, with 100% local independence. Ability to detach a business unit for this environment over a weekend without disrupting any other central or local business unit.

.. and reach the same point of failure where you currently exist only after deploying a net new acceleration technology

 

 Leveling the playing field: It has been clearly established that successful BI projects experience a higher acceleration that is directly related to the degree of success. Acceleration here is measured by satisfied business users, lower spend per project, fewer unplanned projects, happier stakeholders that view BI as an investment, easier budgetary allocations and a high degree of trust – competency of the IT team to deliver results.

On the other hand it is similarly established that failed BI projects experience a drastic slowdown proportional to their degree of failure. Deceleration here is measured by more dissatisfied users, higher budgetary allocations due to trying to fix failed deliveries, higher number of unplanned projects due to lack of meeting business expectations, disappointed stakeholders that start to view BI as an expense, difficulty in getting new budgets approved due to a total lack of confidence in the team to deliver any business results – lack of business confidence in the delivery team.

Examples of F in existing BI environments are totally measurable. Take an inventory of every report in your production BI environment. Drop them to an excel sheet. Separate them by Business function, i.e. FI, OTC, P2P, SCM, etc. Place all the FI reports into one worksheet, OTC into another and so on. Create three columns [1] Can use as is- do not change; [2] Can use but needs change; [3] cannot use please delete. For each report that can be used as-is score a +1; for each report that needs change score 0; for each report that cannot be used score a -1. Then come and post your score on this URL for a global BI Score of F. Enter your email if you want results shared. No company or individual details will ever be share and your input will be in strict confidence.

Examples of F in new BI projects, i.e. not yet live, are also measurable. Take an inventory of every report that your SI partner plans to deliver. Apply the same rules as above and get your users to fill the three columns as above. In this case most of your users will not be able to accurately score the individual reports but you will still get a trend that will be highly beneficial. You will find out quite early what your probable F factor is. Once you go live conduct the same exercise around 30-60 days after go live, as by this time your users will understand the usability of each report and its direct business benefit or lack of it thereof. Compare the two and we once again get very interesting results.

Examples of P in existing projects is scientifically predictable. Your partner’s P score determines the speed at which your partner will pull your HANA BI project towards failure. The pull is a a gravitational pull based on the mass of defective procedures and methodologies that come with a partner. It is the combined score of their recommendations and methodologies. If your partner recommends a HANA installation as a technical installation then score them -3, and so on and so forth. If your partner simply delivers what the client asks them without any scientific inputs or forecasts then socre them -4, i.e. when a pharmaceutical company asked a leading SI to simply replicate 100% their 1998 Cognos reports on to the new HANA plus BusinessObjects 4.0 platform. This was as much the fault of the customer in firstly demanding legacy reports and for the partner in simply accepting a P factor with a very high mass, i.e. the probability of absolute failure was extremely large. In order to get your own propensity score, i.e. the propensity of your current SI, or their recommendations, request your P questionnaire and get your own propensity mass of your black-hole. The bigger the propensity mass the faster this black-hole will pull your strategic success towards failure, the faster you need to travel towards success as your escape velocity.

Examples of n in existing projects is scientifically predictable. In our above example of Cognos the SI ended up providing over 6 months of services in a fixed bid contract – total loss. Even after 6 months the customer had to cancel the project as the very foundations of the project were erroneous. The pull of the large mass of failure was disproportionally large and at a certain point all parties know that Ve could not be achieved. Could this have been predicted – absolutely right before the project had even started.

In yet another example a SI went and delivered over 500 reports. Within 20-30 days the business users realized that the deliverables were not going to meet their expectations, by day 40 businesses reverted to their old reports and stopped using the new BI environment. By day 50 our team was invited with a single statement ‘How can you help get business confidence back in BI’. Upon analysis we found that the methodology, standards, processes and resources were all wrong- so the next project started with a total replacement and rebuild of the BI environment but one-step-at-a-time. Success went from 12%, i.e. 88% failure, to 92% user satisfaction in a matter of 4 months.

So understand Ve, work towards it and measure if your trajectory can release you from the mass of failure and launch you to your goal of success.

In this example the impact of, or resistance caused by, bad decisions of managers and/or inexperienced resources is not taken into consideration even though it has a profound impact on the total Ve of BI projects.
In addition Escape Velocity is a misnomer as it is not any particular velocity but a relative speed that is dependent on the distance from n, or the negative mass of failure. The farther away from P that we are the lesser speed we need to apply to attain Ve, at a certain distance from failure one can remain perpetually free from the negative gravitational pull of P.

Quantifying the HANA BI Escape Velocity

By simple scientific rules
n: is the point of damnation and the center of the mass of failure. It is also the absolute point of no return. No amount of budgets or efforts can make the project escape failure.
The Red circle is the point of escape. The lower your project flies the more energy (budgets, resources and efforts) the project will require to simply remain afloat. The degree of failure (Gartner says this is 50% to 70% right now) determines the point of location on the E1 axis.
The Green circle is the point of survival or equilibrium, at which point the gains are fully sustained with minimal efforts. This is the point launch to Ve. The degree of survival is determined by the point of location between the surface and the green circle represented by E2
E3 is the point of escape velocity, where with a minimal effort BI projects can soar to high degree of success, very low wastage and minimal efforts to attain high gains.

What’s on your roadmap… can you see past the horizon or do you never look beyond your feet..

Sep 12, 2013

The new application that detects a cheating HANA partner


 
As someone once said 'Cheating is a choice, not a mistake'

AUTHOR'S NOTE: What follows represents an actionable roadmap of possible paths in our global HANA decisions. If you consider this story farfetched then do some independent Gartner and Google research and come to your own conclusions. You will hear a lot of key finding repeated in my papers, and the reason for that is though I have been publishing and stating them for over 3 years I find no one listening. Two reasons for that either it challenges everything they, the big x influencers, have believed in for the last decade and built their processes and practice on it, or they are better off not resonating with the Gartner and other statements as that will mean a change of their methodology into something they are not familiar with.

***
I work as a HANA solution architect for one of the big implementing partners and have lived a perfect life in selling in the SAP BI space for the last 14 years. I have been working with this fortune 100 corporation and have been their preferred advisor for over ten years. They trust me and my advice and I am living close to a perfect life, but then this new HANA app ruined everything.

My name is John Dimming, and for almost the last two decades I have happily lived two lives. Most days I am the perfect advisor, a near perfect BI solution architect, SAP BI leader that is dependent, reliable and highly capable. When my customers need any advice I am there for them. 
No one except my select customers knew me and that for me represented my perfect life. I lived in the shadows of perfection and my advice has been taken without much challenge.

I come from an engineering background and got into BI and BI sales as I passed out from the university. My education, my training and my mentors taught me one thing – that BI technology has reached the pinnacle of capabilities and can today, this was in 2002, answer any question that a business user needs. In fact I firmly believed that if a business group needed 60 reports to meet their requirements my business content could give them 300 and far exceed their expectations. I followed the path that over 90% of BI solution architects have followed for the last decade or so.  However, in the back of my mind there was a gnawing feeling that I was not doing a perfect business solution. What we provided were perfect technical solutions.

Then I read the global Gartner report of 2003 that rocked my mind and split my mind into two distinct paradigms. The report, though simple, had a profound impact on the future of BI. It clearly stated that according to the feedback of over 1500 CIO’s “Fewer than 50% of BI reports would meet business expectations”.
This report took almost 2 years to sink-in when I happened to read it again because one of my CFO’s asked me how that related to them. It was followed by another report that stated that ‘98% of BI projects are declared successful in week one of Go Live, yet less than 50% of them remain successful by week 10”

 Looking back I realized though we did 2 to 4 multi-million BI projects a year yet very few of them were truly reference able. In each of them we had popped champagne bottles after go live and never looked back as we celebrated in Mexico or Las Vegas for another project well done. We never looked back – and that is something I started doing around 2010.
I started to see a common pattern of ‘The BI project was an IT success, but a BI failure’ where the client management and key stakeholders could rarely go back to their stockholders and state that their multi-million BI project was a failure. This pattern was consistent whether the project was Oracle, Teradata or any other BI application.

By 2011 I realized that I was part of a big deception of selling very high quantity of reports and custom objects, something that cost clients large budgets, but more often than not very little information. It was common to deliver 360 FI reports but rarely did we measure what business users could actually use.
Business users, who were they, in all our projects we actually forbade them to come into the project war-room. If one of them inadvertently entered the room I personally raised the red flag to the CEO or CFO recommending they keep business users out of the project room as they were an unnecessary distraction. Our statement was - our company was a global consulting leader and we had deployed hundreds of BI projects and we knew more about what the company needed than most business users. We never lost.

Very soon I realized that though I was talented my talent was limited to deception. Having worked with CxO level stakeholders for so long I am trained and can construct perfectly logical success stories and convince my customers. But now a gnawing sense of insecurity crept in as I realized I was continuing to sell application support, architecture, modeling with a solid track record of over 70% failure. But there was nothing else I knew so I continued with my deception and my bonuses.
For all these years I had a free pass that got me a lot of satisfaction that required me to completely cut loose from my forebodings and concerns and after each meeting and sale I would come back a renewed man more convinced that maybe Gartner was all wrong about this.

Then in 2011 an 8 million dollar BI project that I was involved in failed most user tests eight weeks before go live. The BI lead, having read the 2003 Gartner report, asked if they could meet at least 40% user satisfaction they would consider the project a success. I requested my company to assign me to another project which they immediately complied. The project in question was postponed by six months but that is now someone elses concern.
In 2012 I was part of the same BI project where my counterpart had convinced them that their failure was not because of bad design, which I knew to be not true at all, but the platform. We recommended moving to HANA and once again I put my professional garb of deception and convinced my customer that because we had been providing them application and business support. When one of the business stakeholders asked why they should spend on HANA if their current BI could not meet over 80% of business reporting expectations, we shut the person down with protocol efficiency.

Then the VP of sales opened the iPhone application ‘BInformed’ and even till today it kills me that I had never heard of this scientific application designed to expose erroneous decisions on big-data decisions and trap cheating, or inexperienced, advisors, lying SI’s and what BI Valuenomics terms as technical criminals in a global heist. At that meeting I thought it was a humorous game and nothing more.  
Here is how it went down as the game was played by the very VP of sales I had buffed using my CIO protocol card. The game started with the detection of advice along random questions that it dared my team to beat. Being the lead honcho, and the BI Solution advisor, I took it upon myself to represent my company with a firm belief to prove to Mr. VP that he was a fool trying to play a business game with an IT demagogue.

Here’s how it went down.
The game started by asking if we used the standard ‘Z’ and ‘Y’ for custom BW developments and I proudly answered Yes.

It then asked what was the recommended BI architecture Data marts, EDW or FEDW- I knew there was nothing called FEDW and selected EDW.
The next question asked if we recommended taking all of the BW as is to BW on HANA and As I had crossed this bridge just a few weeks ago I again answered a solid and loud ‘Yes’.

This continued and in my and each time it was like hitting a jackpot for every question being asked was something I had been familiar with for over a decade.
By Question 9 or 10 I was feeling on top of the world. The question asked whether we could reduce the price of HANA SW and/or HW and I knew the answer both from SAP and HW partners and stated a clear ‘NO’ and asked for the next question.

This pesky game was trying to read my mind on questions that I had answers to. If I had made up the questions myself I could not have done a better job… I waited to hit the next question out of the park…
Then surprisingly, Mr. VP then stated that though there were 22 more question there was no need waste any more time as the result of these answers would provide an indicative success factor.

I smiled waiting for the result as did the foolish business VP who I would crush for wasting the valuable time of over 27 key stakeholders with this stupid game.
The game pulled out the score and visually and with data stated, in front of my 27 followers and key stakeholders that if the program followed the current path the probability of strategic success was less than 18% and that of tactical success under 24%

I could hear the air punched out of my Client managers guts. I could not believe it.
The CEO asked my manager to explain why the result of our questions was so alarming and whether we should continue with the remaining  questions. To which she unfortunately agreed and asked me to continue answering.
The end result was worse than before. We then challenged the game and were proven wrong once again.
You can guess what happened next. Our companies went for a simple divorce and so did the next three as they were measured on the same silly game. We hear that one company scored over 80% and have been trying to get their answers but each time we reach out to our old loyalists they shrink away in fear.


We not only divorced from that company but the application may result in divorcing me from my company. I have been challenging this vehemently and blogging about this useless game over my social network only to cause more and more people to use this business focused evil game. Who cares about business they are all fools and I will get my Technocrats back on the path that I have been pimping for the last decade. .

Authors note:
1.      This is a fictional story, but is has a string of truth in it.
2.      It is a reminder that if you are a cheater and your BI projects are a string of non-reference able failures maybe you need to retool your solutions, and recommendations, before you make the next HANA pitch
      3.      HANA is certainly not a technical implementation, but a business solution.
4.      My goal here is to place the question in the head of every big x consulting company: What will you’re your life be like when the truth finally becomes inescapable?
5.      And, for business stakeholders: it’s time you took ownership and accountability in every stage and every deliverable from your BI investments, all it takes is two hour of your time.

Gartner’s check:
1.      There is a very high probability that over 50% of reports in your production environment do not meet, or will never meet, business expectations
2.      In 2012 Gartner ran the same report and the result of over 2,400 CIO’s indicated that ‘Less than 30% of BI projects will meet business expectations in 2012-14” (author can send the report deconstructed for free- send email)

What’s in your pocket..

Sep 5, 2013

7 emerging trends in Big Data – SAP BW-on-HANA focused


Today it does not matter where on the planet one lives if we’re involved with SAP then HANA is a very bright light that is no longer on the horizon but getting closer every day. Many large customer are now inside this light and are reaping the benefits of moving to HANA, some are struggling to get to terms. Here are the 7 trends that are ensuring that HANA initiatives are not only successful but also the ROI is substantially lower. Today no matter where you live on the globe you are living in your own silicon valley

1. HANA is not a technology installation but a business solution
Customers and service providers: Despite repeating this singularity since 2010 we still see companies taking to HANA as just a technology installation. A technology installation is defined as lets take our current BW as is and migrate to HANA.  This is a very engineering and technocratic view of deploying HANA and is delivering results but lacking in maximizing its true potential. To these customers we ask a few fundamental questions.
Question 1: What is the business-benefit of accelerating your 700 second query to 1 second if businesses will never use the query?
Question 2: What is your interpretation when Gartner in 2003 stated that ‘fewer than 50% of BI projects will meet business expectations’ or when in 2012 they revalidated that ‘less than 30% of BI project will meet business expectations? Our interpretation is that there are over 50%, or 70% in 2012, of queries in your production BW that business does not need or is not using. Why take all these to HANA
HANA is very sexy but there are bonus points for all concerned to ensure that we clean up the landscape and environment before we migrate to HANA. We have witnessed anywhere from 20% to 60% reduction in database size by clean-up efforts. This translates to 20 to 60% reduction in initial costs and annual SLA’s that can be millions of dollars in each bucket.

2. Apps, Apps and more Apps
Service Providers: The shortest way to HANA success is in building applications for HANA. SAP has already committed a $1 billion fund for HANA start-ups, and this is the actionable roadmap for thinkers and doers to launch their billion dollar company and idea. Without a doubt, this solution cannot be a technocratic solution but need to be a business solution that impacts the business bottom line. The higher the demonstrable impact the higher the probability of success.

3. Big data is now a way of business-success-life

As we dive deeper into traditional RDBMS databases meeting our commitment to provide a query response in a 10 second timeframe is becoming more and more difficult. One simple solution is to decrease the time frame. So when we started BW we saw a year worth of data, then we shrank this to six months, then a quarter, then a month. With each spurt of growth our decision vision is becoming smaller. In driving we call this a tunnel-vision and in driving this can cause accidents. Another method of meeting the 10 second query response is caching, pre-summarizing, and other ‘tunnel-vision’ solutions.
Now suddenly, as big data is becoming more and more a reality from things like social network analysis, customer emotion analysis, running global scenarios, looking at five year trends and other such analytics as a minimum requirement. In addition customer are no longer willing to wait for once a month cost and profitability analysis because it takes 24 hours to run, and this includes global MRP runs, financial closings detailed P&L reports by plant and sales office, etc. All these business expectations and having to deal with very large and very complex runs are converging tin what is becoming best business practice.
So big data is here to stay and grow, business expectations are not going to go backwards and we all need to create dynamic and real-time business solutions to meet, and often, exceed business expectations

4. The Socially connected economy

Days when customers waited for days or weeks before responding to their stock allocations are now gone – people trade in real time and business needs to react similarly. Days when customer lived outside the firewall and marketing firms provided customer sentiments once a year are now gone- now companies measure customer emotions in real-time as they release new products or trade promotions. Days when customers talked with one or two individuals with little global impact are gone- now customer constantly communicate over social networks and can literally make of break a product launch in a matter of hours- companies now track thee customer in real-time and we are now living in a PR golden years as we can see emotions in real time. Days when service was only dispatched when a machine broke-down are now gone- now machine parts talk to other machine parts and call for service parts before they breakdown- companies are now working with machine talk in order to save billions of dollars in machine downtime and service outages. Our cars routinely tell us it is time for servicing or something is not optimal, like the tire pressure is low.  All of this is just the beginning of the socially connected economy where not only human but all kinds of devices talk to each other and automated consolidators for global optimization.
5. The globally linked economy
More and more people are now citizens of social groups some larger that many nations. These groups talk about families in Facebook or focused discussions on HANA like in ‘In-Memory SAP HANA’ group and learn and share their experiences with other members in the socially connected groups. Each of these members is influencing others in small and great ways and these links are becoming the source of global sharing of ideas and concerns.

6. SAP HANA is truly not as costly as you perceive it to be
All companies that have taken the route to ‘technocratic-HANA-Installation’ have mostly overpaid for their assets, and often compromised their ROI to a very large degree. Proactive companies are coming out with scientific principles on how to increase quality, lower costs and decrease time for deployment. Today there are few hurdles, as many customers have built all the proof points and what customers get today is extremely efficient ways to decrease their HANA costs, accelerators to rethink their global HANA methodology, many ways to reduce their HANA costs and more ways to get higher and higher user satisfaction. Very few of these are based on simple HANA installations. What one gets reminded day after day on the road is the 2010 Gartner statement ‘Without business in business intelligence, BI is dead’. So business stakeholders roll-up your sleeves and become part of the HANA deployment, architecture, modeling and deliverables decision flow.

 7. What got you here will not take you there
If we believe Gartner’s statements in -section 1, question 2- are true then our current architecture, standards and processes are currently pretty flawed. In fact they represent a 50% to 70% flaw. Proactive companies are spending a little time planning and laying a strong foundation of ‘Global HANA methodology’ and working with new HANA based paradigms, architecture, modelling, standards and processes and realizing user success scores over and above 85%- after 20 weeks of go-live. I state this based on another research that came back with ‘98% of BI projects are declared successful in week 1 after go live, yet only 50% remain successful by week 10’.
So your thought of the day is to measure the success of your BI project only 15 weeks after go-live, i.e. when business is actually using and familiar with that they have received.

Aug 28, 2013

IS SAP HANA simply a technical install or a business solution

Is HANA a technical installation or a business solution.

BW-on-HANA Example

Technocratic Installation roadmap
1. Buy HANA
2. Ask your existing partner what to do with it
3. Use the same old 'Z' and 'Y' naming conventions
4. Use the same ole EDW architecture
5. Deliver the same old efficiencies
6. Use the same ole application guidelines and legacy resources, who rapidly revert to their ole habits
7. Take your BW 'As-Is' and migrate as you feel that is your lowest cost option
In other words use your same ole partner and their same ole resources
8. Migrate to HANA
What you get:
  • You accelerate a 800 second query to 1 second, that business never used and will never use.
  • You implement the same architecture, models and standards that currently deliver over 70% of queries that your users don't need.
  • So what you are doing is simply accelerating your inefficiencies.
  • What you will find out is that for every dollar you saved from planning you will now need to spend $4 to $40 to try and fix it after go live.
Check:
If most of the queries in your production system are queries that do not meet 80% of your business needs - then you are on this roadmap

Business Solution
Tell me the advantage of accelerating a query from 700 seconds to 1 second if business never use it - and you are now comming face-to-face the tip of the iceberg.
1. Understand the capabilities and limitations of HANA
2. Train your executives on 'Do's and Don'ts' of HANA
3. Remodel on the new FEDW (Gartner) Architecture
4. Delete and replace all your legacy ineffeciencies
5. Get an audit of your BW landscape and systems
6. Increase quality assist with decreasing costs
7. Review all alternatives
8. Drop TCO by 50-60%
What you get:
  • Your quality of information becomes 20-30% better
  • Your initial cost for HANA migration drops by 40-50%
  • Your initial cost of HW drops by 40-50%
  • Your annual support cost, for HW and SW, drops proportionally
  • Your business users understand exactly what they are getting and what not
  • You end up eliminating inefficiencies and accelerating decisions
Check:
If your business users are happy on week 1 - its no guarantee of a good BI project. If they are happy after 20 weeks that is something to be very proud of
Retinink architecture, modeling, standards and lower costs by atleast 50%

The Magnificent 7 BI Quotes- Famous quotes to make every HANA projects a success

Often when one reads a great quote it has the power of firstly making you pause in sheer delight. Then if it good it makes you ponder and relate it to one’s life experience. If it is really astounding it has the power to alter the way we look at life and in this case alter the way we move ahead with how we look at the delivery and design of information management initiatives. This includes BI or deployment of BI projects. Throughout my life I have been blessed with words that have influenced me and some that have cohesively change the way I look at my past behavior, with an impact of changing how I would do things henceforth. Just like data is the center-of-the-universe in a data warehouse, words are the winds that guide our ship of enlightenment and imagination.

My favorite is

1.      “Without business in business intelligence, BI is dead” Gartner

o   Translation: The more you involve business in every BI decision the more successful your BI project will be. In every BI project where I have involved business we have beaten the Gartner nightmare (see 4 & 5). If your SI asks that business users be kept outside your BI project doors – you are highly recommended to quickly show them yours.

After that

2.      “98% of BI projects are declared successful on week 1, yet only 50% of them remain successful by week 10” 2010 BI Valuenomics

o   Translation: “The success of a BI project can only be measured by how satisfied your business users are 15-20 weeks after go live.

3.      “Show me a person who has never made a mistake, and I’ll show you a fool” Bernard Shaw

o   Translation: Mistakes are the foundation of evolution. But, only if we can learn from them. If someone is arrogant enough to state they have always been right either they have no creative ideas, or they are liars.

4.      “Fewer than 50% of BI projects will meet business expectations” Gartner 2003

o   Translation: There is a high probability that if your BI project went live between 2003 and 2010 that over 50% of the reports in your production environment are not being used by your business users”

5.      “Fewer than 30% of BI projects will meet business expectations from 2012 to 2014” Gartner 2014

o   Translation: As we continue to follow the same old rules on to new technologies all we are doing is accelerating our acceleration towards defects and failure.

6.      “Insanity is doing the same thing again and again, and expecting different results” Albert Einstein

o   Translation: Tangential thinking (Edward de Bono)  logic stats that we all feel most comfortable doing things that we have done before. This means that if we introduce a developer with legacy standards to new HANA standards and processes they will most likely revert to their old methods unless we they are audited and regulated frequently – until the new order becomes they way of their life.

7.       On big data and new technologies “This is a time of accelerating change, where your current IT architecture will be rendered obsolete,” Mr. Sondergaard, Gartner Analyst, said. “You must lead through this change, selectively destroy low impact systems, and aggressively change your IT cost structure. This is the New World of the Nexus, the next age of computing.”

o   Translation: With HANA as the new SAP platform you will need to change your architecture to global FEDW (Gartner 2013) designs, work with new HANA standards and processes and take modeling to focus on new challenges. The only way forward is scientific change that selectively destroys old inefficiencies and replaces them with modern methodologies that increase the overall data quality, decreases the overall cost and time in one single step.

To me, the first key takeaway is to push yourself through fear and uncertainty and place your life not on current Technocratic authoritarian assumptions that technology alone can answer all questions. The second is to realize that HANA is not just another technical installation but a business solutions. The third is that companies that follow the old technocratic methodologies will either go the way of Gartner's predictions for 2012 (see #5) or land into the insanity bracket of Albert Einstein (see 6). The choice is clear and now the writing's on the wall